The newspaper of Italy, seen from abroad
La Veduta — giornale di idee, cultura e affari
Inaugural Edition № 1
Back to the edition

LOMBARDIA

Vertiv doubles data-centre cooling capacity near Padua for AI boom

US technology company invests in manufacturing expansion at Tognana campus to meet rising demand from artificial intelligence infrastructure

Beatrice Comolli311 wordsEdition55Friday, 24 July 2026 — Edition № 55

Vertiv, a US manufacturer of data-centre infrastructure, is investing in its Tognana technology campus near Padua to expand manufacturing and integrated testing capabilities for cooling systems, according to Stock Titan. The company expects to double chiller production capacity in the region by the end of 2026. The expansion reflects the surging global demand for cooling solutions as artificial intelligence workloads drive data-centre construction across Europe.

The Padua investment signals confidence in the Veneto region as a manufacturing hub for critical technology infrastructure. Vertiv's choice to scale production in northern Italy rather than shift capacity elsewhere underscores the region's existing strengths in precision engineering and logistics. The company has also announced plans for a 2027 laboratory to test cooling systems at extreme temperatures, suggesting a long-term commitment to innovation in the region.

Lombardia and the broader Veneto region have positioned themselves as manufacturing centres for advanced technology, competing with other European locations for foreign direct investment in AI-related infrastructure. Vertiv's expansion near Padua joins other recent commitments by technology companies seeking to establish European production footprints as demand for AI computing accelerates. The cooling systems Vertiv manufactures are essential to data-centre operations, making the company's investment a bellwether for the pace of AI infrastructure buildout across the continent.

The timing of Vertiv's announcement—expanding capacity ahead of demand materialising—reflects investor confidence that European AI adoption will sustain high levels of data-centre investment. For Padua and the surrounding region, the investment promises manufacturing jobs and supply-chain activity in an industry that is expected to grow substantially over the coming decade. The planned 2027 testing facility suggests Vertiv intends to position the campus as a centre for product development, not merely assembly, which could attract ancillary suppliers and technical talent to the area.

Share